A new landfill cell is born. Photos show process from start to finish. Construction shown on location at the Tuscarora site.

  •  Removing topsoil

    Removing topsoil

  •  Fill material being spread and compacted

    Fill material being spread and compacted

  •  Over 30,000 truckloads of fill are delivered

    Over 30,000 truckloads of fill are delivered

  •  Liner under adjacent cell ready to be joined to new liner

    Liner under adjacent cell ready to be joined to new liner

  •  Clay being deposited for liner layer

    Clay being deposited for liner layer

  •  Clay liner layer being compacted

    Clay liner layer being compacted

  •  Clay liner smoothed and being readied for man-made liner

    Clay liner smoothed and being readied for man-made liner

  •  Liner material deployed over clay layer

    Liner material deployed over clay layer

  •  Each man-made liner is tracked by number

    Each man-made liner is tracked by number

  •  Liner material being aligned for weld

    Liner material being aligned for weld

  •  Seams being welded together

    Seams being welded together

  •  1st man-made liner on left, and 2nd layer on right

    1st man-made liner on left, and 2nd layer on right

  •  Drainage liner of granite stone

    Drainage liner of granite stone

  •  Granite stone being delivered

    Granite stone being delivered

  •  Finished cell with temporary rain cover

    Finished cell with temporary rain cover